Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 10.01pm, Monday 22nd June, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Ashbourne |
The A6 from Bakewell to Rowsley is very popular with cyclists but is also very busy. There is an under-utilised footpath (in poor condition) which could be resurfaced to become a shared use footway / cycle path.
Comments reflect the views of the original submitter only.