Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 4.26pm, Friday 23rd October, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 2° |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Mill Road Depot site under construction, which will have the Chisholm Trail along it
Comments reflect the views of the original submitter only.