Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bellahouston-qeuh, bollards, buildout, m8motorway, nib, path, underpass |
Date time: | 1.32pm, Saturday 21st April, 2018 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A new approach path to the M8 motorway underpass at the end of Craigton Road, arranged to dissuade obstructive parking, although this doesn't always work (see #102730).
Comments reflect the views of the original submitter only.